RRCC 24-01-IFB01C
Replace East Wing Roof, Lakewood Campus, Phase 1 of 2
Project No: 2023-084M22
Project Description:
a. This project includes the removal of existing roof systems and associated flashings for in-scope roof replacement areas. The Contractor will be required to furnish and install a new fully adhered black EPDM membrane roof assembly system at all roof replacement areas. All work will include new flashings and new sheet metal (fascia metal, parapet cap, counter-flashings, roof jacks, etc.) as shown per roof deck assembly on the drawings.
b. All work noted above to be performed as specified in accordance with the design drawings, specifications, and governing building codes.
slfrf terms and conditions
east wing ph1 roof dwgs bid set
federal provisions 2022
east wing ph1 roof specs bid set
replace east wing roof
RRCC 23-02-RFQ01
Project Title: Replace East Wing Roof, Lakewood Campus, Phase 1 of 2
Project No: 2023-084M22
Project Description: The design work for this Design-Bid-Build project will be contracted directly with a Roof Consultant firm under the State of Colorado’s Architect/Engineer Agreement SC5.1 (Rev 07/2022), along with the Terms and Conditions SC5.1TC (Rev 07/2022). The work will consist of design for BOTH Phases 1 AND 2. Each phase will be competitively bid and constructed separately (only Phase 1 has been funded to date), therefore two sets of construction bid documents will be required. Stamped drawings and specifications must be submitted to Owner’s third-party code review consultant for review.
RRCC 23-02-RFQ01 Replace East Wing Roof, Lakewood Campus, Phase 1 of 2
SC-SGC Supplemental General Conditions Federal Provisions 2022-07-28
SLFRF Terms and Conditions 2022-07-28
RRCC 22-06-IFB03
Project Title: Replace Coil and Supply Fan, West End RTU AFB
Project No: 2022-050M21
Project Description: Prime contractor to replace the coil and supply fan in west end RTU AHU-1, including all associated work, per the drawings and specifications. This AFB replaces RRCC 22-01-AFB initially posted in fall of 2021.
RRCC 22-06-IFB03_Replace Coil and Supply Fan, West End RTU AFB
Project Manual Replace Coil and Supply Fan, West End RTU
Construction Drawings Replace Coil and Supply Fan, West End RTU
RRCC 22-05-IFB
Project Title: Refurbish West Wing Elevator, Lakewood Campus, Phase 1 of 1
Project No: 2019-089M21
Project Description: Prime contractor to modernize one hydraulic passenger/service elevator, per the Elevator Modernization Bid Specifications. The work includes replacement of the elevator control system, cab upgrades and related work.
Notice of Award_Project 2019-089M21_Refurbish West Wing Elevator
Addendum No. 1_Reburbish West Wing Elevator 4.29.22
RRCC 22-05-IFB_ Refurbish West Wing Elevator_Adverstisement for Bid
Project Manual_Refurbish West Wing Elevator
Information for Bidders_Reburbish West Wing Elevator
Construction Project Contacts:
Renee Murillo - Procurement Manager - renee.murillo@rrcc.edu - 303.914.6345
Claire Dean - Program Assistant - claire.dean@rrcc.edu - 303.914.6393
Mark Bana - Facilities Director - mark.bana@rrcc.edu - 303.914.6220